Project

General

Profile

Actions

Task #4685

open
PS PS

launch page designed and login page designed with integration

Task #4685: launch page designed and login page designed with integration

Added by Pravin S 4 days ago. Updated 4 days ago.

Status:
Resolved
Priority:
Normal
Assignee:
Start date:
08/19/2026
Due date:
08/19/2026 (4 days late)
% Done:

100%

Estimated time:
4:00 h

Description

The launch page has been designed and implemented, along with the login page and its integration. Both screens are now connected and functioning smoothly, with the required UI, navigation flow, and login functionality integrated into the SIRU app.

PS Updated by Pravin S 4 days ago Actions #1

  • Status changed from New to Resolved
Actions

Also available in: PDF Atom